Sunday, October 31, 2010
The Doors
Foundation footings have been poured and this coming week the hope is that the foundation or frost walls will be poured. Part of the process involves locating the door thresholds and to that end the drawing below indicates the center lines of the double or French doors. The red symbols are the locations of the hose bibs (spigots for garden hoses).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment